
Technopôle Angus / Montreal
VINCI CONSULTANTS was mandated by the Société de Développement Angus (SDA) initially to draft, in collaboration with the client, a request to the Green Municipal
VINCI CONSULTANTS was mandated by the Société de Développement Angus (SDA) initially to draft, in collaboration with the client, a request to the Green Municipal
The mandate was to assess the feasibility of integrating several types of BMPs in the context of the repair of Avenue Papineau over a section
The Westbury project, located in Côte-des-Neiges in Montreal, is the redevelopment of a 3.4 hectare site previously occupied by the Armstrong factory. The project includes
The project is located in the town of Saint-Bruno-de-Montarville, on the south shore of Montreal, Quebec, south of Route 116 and west of Promenades Saint-Bruno.
The mandate initially included an overall assessment of the site’s problems (low ditch slopes, poorly maintained culverts, phragmites invasion and the presence of iron ocher).
The objective sought in the design of the Longueuil public market’s stormwater management system was to combine Optimal Rainwater Management Practices (PGO) with water in
First, Vinci Consultants was commissioned by the city of Montreal to define the opportunities for sustainable water management on the site. This former industrial site
Mountain Equipment Co-op (MEC), a Canadian cooperative selling and renting hiking equipment, has set itself the goal of reducing its ecological impact. Thus, a bioretention
Le Mountain Equipment Co-op (MEC), une coopérative canadienne de vente et de location d’équipements de randonnée, s’est donné comme objectif de réduire son impact écologique.
Context of the project The project involves the construction of 155 new housing units on the former site of the municipal workshops of the city
The project consisted of developing two new pedestrian paths linking Rue Viau to the center of Parc Maisonneuve. The mandate Plans and profiles have been
The project involves the development of a maneuvering area and a storage area (60,000 and 100,000 sq. ft. respectively) for new landing stages. Our mandate
Notre-Dame College wanted to renovate its sports field including a space for football, soccer, a running track and stands for spectators. The client’s main concern